Powiększ tekst
Drukuj
PDF

Powiększ tekst
Drukuj
PDF

  •  
  •  
  •  
  •  

PGNiG Technologies is a market leader in providing Engineering, Procurement, Construction  and Operation & Maintenance Services for the Oil & Gas Industry.

Our three main business areas within oil and gas industry:

  • Turnkey investments
  • Manufacturing / production
  • Service / aftersales

 

Ongoing and completed projects

PGNiG Technologie Spółka Akcyjna

Registered Office
Naftowa st. 8
38-400 Krosno

 

Completed projects

Powiększ tekst
Drukuj
PDF

Main investment projects completed by PGNiG Technologies group:

Construction of above-ground oil and gas mine facilities and development of oil and gas wells

  • gas well Wielichowo - Ruchocice - Łęki (wielkopolskie voivodship): 
    • central gas station, capacity: 100.000 Nm3/h,
    • 10 gas well areas
    • 86 km of technological and transmission pipelines
  • Total capacity of explored gas was 88,2 thousand Nm3/h.
  • gas mine Radlin - capacity 50.000 m3/h (first in Poland fully automated natural gas mine)
  • gas mine Dębno - deposit part - 130 km oil and gas pipelines. Exploited resources amount to 30 billion Nm3 of natural gas and 10 billion tons of oil.
  • gas mine Mełgiew (lubelskie voivodship):
    • central gas station
    • 57 km of gas pipelines
    • gas desulphurization
  • gas mine Jodłówka - capacity 39.000 Nm3/h
  • gas mine  Nosówka - capacity 15.000 Nm3/h
  • gas mine Terliczka - Stobierna - capacity 20.000 Nm3/h
  • gas mine Biszcza - Księżpol - capacity 9.000 Nm3/h
  • gas mine Jasionka - capacity 24.000 Nm3/h
  • gas mine Wola Różaniecka - capacity 15.000 Nm3/h
  • gas wells Kaleje, Kaleje E
  • gas wells Pantalowice 5K i 6K
  • designing and execution of installation for storage and pumping of wastes and modernization of existing technological installation located on the Gas Mine Borzęcin


Underground gas storage facilities (UGS)

  • UGS Brzeźnica - operating capacity 65 mln m3
  • UGS Swarzów - operating capacity 90 mln m3
  • UGS Strachocina - operating capacity 150 mln m3 (currently developed to 330 mln m3)
  • UGS Husów - operating capacity 400 mln m3
  • UGS Mogilno (to the preliminary stage of high pressure pumping) - operating capacity 166 mln m3
  • UGS Wierzchowice (etap zerowy) - operating capacity 168 mln m3
  • UGS Daszewo - operating capacity 178 mln m3
  • UGS Bonikowo - above-ground facility

Gas compressor stations

  • Maćkowice - flow capacity 570.000 m3/h
  • Lubaczów - flow capacity 120.000 m3/h
  • Żołynia - flow capacity 120.000 m3/h
  • Mirocin - flow capacity 120.000 m3/h
  • construction of central gas dehydration unit  at gas compressor station Maćkowice

Gas pipelines

  • gas pipeline DN 350/300 Kościan - Zielona Góra, L - 97,2 km
  • gas pipeline DN 500 Włocławek - Gdynia (section Kwidzyn hub - Vistula river), L - 13 km
  • gas pipeline DN 500 Czeszów - Wrocław, L - 32,5 km
  • gas pipeline DN 800 Kidricevo - Rogatec (Slovenia), L - 19,5 km
  • high pressure gas pipeline DN 350 and optical fibre cable with infrastructure between gas mine Kościan and KGHM Żukowice / Polkowice, part gas mine Kościan - hub Szczyglice, L - 76,5 km
  • development of gas infrastructure Jędrzejów, DN 300, L - 30,5 km
  • high pressure gas pipeline DN 500 in Podbeskidzie region, L - 21,94 km
  • high pressure gas pipeline DN300 PN 6,3 MPa between Moroczyn and border of Werbkowice -Zamość
  • high pressure gas pipeline DN700 between Sędziszów and Tarnów together with pressure station replacement
  • high pressure gas pipeline DN300 PN 6,3 Mpa between Pęczelice and Gacki, L-12,7 km
  • reconstruction of high pressure gas network DN300 PN 6,3 between Warzyce and Gorlice - 3 stages
  • high pressure gas pipeline between Turzno and Ostraszewo (Łysomice borough) together with reducing and measuring station I st. Q = 8 000 Nm3/h 


Hot-tap linestop

  • two-way closing of gas supply on high pressure gas pipeline DN250 Krasnystaw - Zamość
  • two-way closing of gas supply with temporary bypass DN80 on high pressure gas pipeline DN200 Krasnystaw - Zamość
  • two-way closing of gas supply with temporary bypass DN300 on high pressure gas pipeline DN500 Krobia - Grodzisk
  • one-way closing of gas supply on high pressure gas pipeline DN250 Swarzów - Tarnów


Others

  • Wierzbno terminal together with access to PERN pipeline (woj. zachodniopomorskie):
    • oil storage facility 20.000 m3
    • oil distribution to "Przyjaźń" pipeline at about 1.000 m3/h
    • steel technological pipelines form DN 100 to DN 500, L - ca. 3 km
  • manufacturing and assembly of steel frame for workshop TAGOR (over 85 tons)
  • manufacturing and assembly of the reinforcement components for steel frame for workshop TAGOR (over 28 tons)
  • modernization of a modular gas station in Września and Kleszczówka
  • modernization of hub station in Lubienia
  • CNG filling station in Tarnów
  • technical project and construction of CNG filling station in Lublin

Manufacturing

  • production of oil and gas equipment for PGNiG Capital Group, among others:
    • UGS Strachocina - christmas trees, casing heads, separators, water degassers, absorber columns
    • UGS Kosakowo - christmas trees, leaching units
    • UGS Mogilno - christmas trees, casing heads, gate valves
    • Cicha Góra - tanks, separators, etc.
  • equipment for Gaz-System (parts for motocompressors and gas engines)
  • production of offshore euqipment for Aker Solutions (blocks, fingerboards, hydraulic roughnecks, torque wrenches)
  • equipment for POGC Lybia (christmas trees, casing heads, adapters)
  • equipment for UGS Tranowice for RWE (Czech Republic) - casing heads, christmas tree
  • cooperation with Petrobaltic (renovation of gate valves, christmas trees, manifolds)
  • deliveries for FX ENERGY (christmas trees, spacer spools)